I’ve been considering insulating suspended floors by lifting the boards, leaving the joists in place, filling the void with foamed glass aggregate to the level of the joists and filling between the joists with insulation. This should provide scope for increased insulation than just the insulation between joists. The voids between the foamed glass pieced should allow ventilation to continue but does that seem a workable solution?

Leave a Reply