In blocks of flats that have a ‘narrow cavity’ (40mm) wall to the un-heated corridor, can the ‘narrow cavity’ to the UHC be filled with expanded polystyrene beads to satisfy PAS2035 and be signed off as compliant or can the narrow cavity be insulated with EWI directly? Will the UHC be considered a fail if left uninsulated?