In blocks of flats that have a
‘narrow cavity’ (40mm) wall to
the un-heated corridor, can the
‘narrow cavity’ to the UHC be
filled with expanded polystyrene
beads to satisfy PAS2035 and be
signed off as compliant or can the narrow cavity
be insulated with EWI directly? Will the UHC be
considered a fail if left uninsulated?