If I have an EWI property, can I
fit verge trims to the top of the
system and put the changing
of the trim in the medium-term
plan when the roof is reroofed
in say, 5 years’ time? I’m of the
opinion that as it’s part of the
measure being installed then this
wouldn’t be allowed as it’s not a
measure on its own but part of
the system being installed (and
PAS 2030 – 2019 states not to
use verge trims) but I’m getting
different responses from other
Coordinators, Designers and
Installers?