If a cavity wall has been filled and then we’re looking to add external wall insulation, is this possibly a high-risk strategy? Plus, if you’re looking to extract the existing cavity insulation and refilling it, would you need to leave empty for a period of time to allow the walls to dry out?

Leave a Reply