I have a project where the total
number of properties is well
above the level for risk path C,
but the houses are spread over
a 10-15 mile radius from the
centre point.
The installer has been informed it should be
risk path C but does not understand why.
If only 15 properties are being refurbished at a
time on the same street, would this then make
it risk path B?