A council client has started
Path C scheme on non traditional PRC dwellings with
predefined EWI measures.
The assessment has identified
cavity infill insulation in poor
condition – a EWI systems
installer has advised that it
is fine to leave these in situ
and install EWI over the top
– however assessor thinks it
should be extracted as it was
installed some time ago so will
have a different lifespan than
the EWI and shouldn’t have
been installed in the first place
to PRC construction type.
What do we advise?